You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
The first post of this thread?Somewhere i read it was due to be completed Q1 2024
It was shown as Q1 before Tesla removed the Q from their Find Us map (and now only show the year). Q1 seems plausible given your recent photos of the site.Somewhere i read it was due to be completed Q1 2024
With the protective orange tarps (and the wood framework for more tarps?) it looks like they may still have some work to be done out of the weather. Did you notice if the BCH transformer was in place? To be placed on the concrete pad in lower right corner of the first photo?McBride still has no BC Hydro Meter, pics from this morningView attachment 1002627View attachment 1002626
This should be trueHow sure are we that it's a supercharger and not HPWCs or even 3rd party EV chargers?
Hearsay from locals is notoriously unreliable.
Still no BC Hydro Meter, did a long distance road trip test in -27c from Prince George to McBride and back suffering on BC Hydro's 50 kw charger!View attachment 1008162
More radio stations are reaching out to continue the discussion, thanks for the shout-out!Read the CBC article that was done about your trip in cold weather. Well done for working with CBC to bring some knowledge about EV's and cold weather driving to more rural Canadians.
We need more articles like this to push back against the false narratives trending out there by right-wing politicians and media.
No meter (and no snow!) but getting the transformer puts it one step closer.McBride still has no meter as of SaturdayView attachment 1020011