DMC5180
Member
Because I figured since no one lives in Batchawana, someone who lives in Soo might follow the Soo SC thread more closely.
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Because I figured since no one lives in Batchawana, someone who lives in Soo might follow the Soo SC thread more closely.
Up and running! Limited power - 50kW for nowView attachment 484784
Awesome! I’m assuming Espanola and Blind River are active too, but we need someone to check them out first before calling it official.Up and running! Limited power - 50kW for nowView attachment 484784
Awesome! I’m assuming Espanola and Blind River are active too, but we need someone to check them out first before calling it official.
I have updated Supercharge Info
Well, there are 2 reported open. It's December 4th, so there should be another 2 powered up already.
Yay! My TCH dream draws closer to reality.
Okay, smarter people, explain something to me. SSM and the nearly simultaneous North Bay Superchargers are both V3 and both 6 stalls. My understanding (a phrase laden with caveat) is that each V3 cabinet supports 4 stalls. The photos clearly show two V3 cabinets in each location. So why not 8 stalls instead of 6? There appears to be room enough.
It's sized to better fit expected demand. Tesla did put in the underground conduit for all 8 stalls but is only actually finishing 6 currently. As the number of Teslas increases and therefore the numbers of cars using the stations rises, they'll be able to quickly and cheaply expand to add the "missing" 2 stalls. In the mean time it saves money.Yay! My TCH dream draws closer to reality.
Okay, smarter people, explain something to me. SSM and the nearly simultaneous North Bay Superchargers are both V3 and both 6 stalls. My understanding (a phrase laden with caveat) is that each V3 cabinet supports 4 stalls. The photos clearly show two V3 cabinets in each location. So why not 8 stalls instead of 6? There appears to be room enough.
Yesssss it's finally happening!!!Up and running! Limited power - 50kW for nowView attachment 484784
North Bay was open briefly and then turned off again - is it possible for somebody in SSM to verify whether this Supercharger is still functional as well please? /cc @MacLeodMXYesssss it's finally happening!!!
North Bay was open briefly and then turned off again - is it possible for somebody in SSM to verify whether this Supercharger is still functional as well please? /cc @MacLeodMX
I haz a sadAt 1050am today, all SSM chargers were off, unfortunately.
I haz a sad
This does make me wonder if they can enable and disable these Superchargers remotely - perhaps this means we will see massive simultaneous activation?
I hate the waiting game. It's boring. And the first person to tell me to stay calm can have two middle fingers for their trouble.
Yay! My TCH dream draws closer to reality.
Okay, smarter people, explain something to me. SSM and the nearly simultaneous North Bay Superchargers are both V3 and both 6 stalls. My understanding (a phrase laden with caveat) is that each V3 cabinet supports 4 stalls. The photos clearly show two V3 cabinets in each location. So why not 8 stalls instead of 6? There appears to be room enough.
Just what the Canada sub-forum needs is more outrageous speculation. Still don't get why anyone thinks the TCH superchargers are going to be activated in a different manner than the other 1,000+ superchargers worldwide.This does make me wonder if they can enable and disable these Superchargers remotely - perhaps this means we will see massive simultaneous activation?
Awesome! I’m assuming Espanola and Blind River are active too, but we need someone to check them out first before calling it official.
I have updated Supercharge Info