Quick update - signposts going up, cosmetic work in progress and city transformer pad needs some concrete - looks like all other wiring in place - main switch panel installed. Interesting to see SC's will have only two walls around them .. open to the parking lot - no poles on west and south sides
Concrete base for city transformer poured. Curbs and asphalt, fixed. Most of the dirt has been replaced. Enclosure (Fence) build for SC's ( no posts on West and South side of SC's for fence) . Looking good at Woodside
Not much change - no transformer - lots of small cosmetic work - e.g. new black asphalt paving around SC cabinets - no lines yet.
We know that last SC in Markham took approx 1 mth from transformer to live
Markham Woodside Supercharger is online. I stopped by to try Supercharging for the first time and got around 90kW. My Tesla Account was billed, but the Paid Supercharging cost didn't show up on my Model 3 display.
Markham Woodside Supercharger is online. I stopped by to try Supercharging for the first time and got around 90kW. My Tesla Account was billed, but the Paid Supercharging cost didn't show up on my Model 3 display.
Aww! I discovered this charging site last week by accident when I visited the Markham area last week from June 25 to 28th. When I was there, it was still fenced off. I was probably only 1 or 2 days too early.