Where you took the first shot, is right next to the power pole. did you notice if the power cable roll was run up the pole yet? it was rather large and hard to see.
Pics from yesterday:
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Where you took the first shot, is right next to the power pole. did you notice if the power cable roll was run up the pole yet? it was rather large and hard to see.
What's up with that sharp right turn out of the lot? Nevermind, this is Virginia, traffic engineering does not exist.
You'd think that Vienna can afford to burry its power lines. That's one thing that's underappreciated in Reston.
With all of the trees in Reston power outages would be a lot more common. Underground wiring if done improperly can indeed be problematic. In my community someone spliced the 240V wires in a pull box in the ground which promptly filled with water, both rain and condensation, ate its way through the wirenuts and eventually caused enough leakage to ground that the charging stations gave errors. Underground wiring here is basically underwater wiring, if done properly, at the right depth and properly marked it is not a problem, just expensive.Ha, I haven’t escaped any issues in Reston even though we are underground. Randomly lost power followed by an excavation of an entire lawn overnight. I guess drainage is a big problem now with all the rain from the last several years...
Pictures from today. No power looks like it’s going to the pedestals right now as no lights on them are on.
View attachment 541286
Dominion was out this morning working on the overhead connection...
Hot off the press. I was just over there snooping around the site -- and I struck up a conversation with the friendly general contractor for the site. Here's the scoop from him:
1) Tesla supercharger ready to go -- BUT it won't open until Wawa is officially open
2) When is that? Wawa is in there now getting all their equipment installed and are close to completion - shelving, drink machines, coolers,etc etc
3) "Certificate of occupancy" and some other acronyms (i didnt quite understand) could be issued in about 2 weeks
4) But -- the "official" Wawa open date is end of July (as I believe i heard him). Seems that date could be beat by a bit
So, as usual with SC starts, look like we all have to be patient. Things never happen as fast as we think they should.
For the electricians out there. In photo below, the green unit is buzzing - but white units are not.
View attachment 545285
from the side street (not Maple) there were no barricades when i was there. maybe that is during construction hours that it is open?That would also depend on Wawa pulling down the barricades also.
from the side street (not Maple) there were no barricades when i was there. maybe that is during construction hours that it is open?