Redhill_qik
Active Member
I think you are screwing with those of us that have tried to decipher these as VCP*VCP*T*T likely doesn't exist. Did you mashup VPC*VPC*CCA and TRANS*T*T?After reading this thread diligently as it emerged, I was preparing myself for a challenge when the first B&W bill arrived.
OMG! You folks aren't kidding.
You need a double Ph.D. in nuclear string theory and economics to get through it. Is there a hidden acronym table somewhere to translate the "VCP*VCP*T*T" entries?
All the best,
BG
Most the short hand means something to programmers and analysts from commercial generators, but to the residential user it is just noise from duplicate reporting and breakdowns of breakdowns. You can find out what these related to by searching in the document for the individual component like VPC to see that is the CCA PCIA charge or the amount to find where this is used elsewhere.
IMHO, this is what matters:
- First page summary
- Minimum Daily Charges (MDCs)
- Non-Bypassable Charges (NBCs)
- Current Month Energy Charge or Credit
- Second page
- TRUE-UP HISTORY SUMMARY table
- Third Page
- BILLING TOU ENERGY table - Breakdowns imports/exports by TOU period and tariff rate periods