I'm doing a solar panel build on 3 different houses, all within 1/2 mile of each other. I figured this thread might be beneficial for those who are looking into build times, problems, price increases, adjustments, etc. I will keep tracking the house updates in the original post (if possible) and will add progress pictures in the following posts, then link to the posts with pictures in the original post. Let's see how Tesla will do with 3 separate projects, right next to each other, and if they're up to the challenge of completing all in a reasonable amount of time.
Let me know if anyone wants any specific information to be added as I'm willing to share anything that could help someone else with their solar journey.
04/19/22 - Received an email from EnergyOrdersNA advising the design is taking longer than expected
Today - Awaiting the System Design
04/19/22 - Received an email from EnergyOrdersNA advising the design is taking longer than expected
Today - Awaiting the System Design
04/19/22 - Received an email from EnergyOrdersNA advising the design is taking longer than expected
Today - Awaiting the System Design
Let me know if anyone wants any specific information to be added as I'm willing to share anything that could help someone else with their solar journey.
House 1
04/13/22 - Order Placed for 19.2kW w/3 Powerwalls, home assessment completed, HOA form signed04/19/22 - Received an email from EnergyOrdersNA advising the design is taking longer than expected
Today - Awaiting the System Design
House 2
04/14/22 - Order Placed for 9.6kW w/2 Powerwalls, home assessment completed, HOA form signed04/19/22 - Received an email from EnergyOrdersNA advising the design is taking longer than expected
Today - Awaiting the System Design
House 3
04/15/22 - Order Placed for 12kW w/2 Powerwalls, home assessment completed, HOA form signed04/19/22 - Received an email from EnergyOrdersNA advising the design is taking longer than expected
Today - Awaiting the System Design