Yes, I did the same thing. Had to call my OA to verbally confirm that the changes I had made on the Design page were on the doc. It doesn't seem to populate automatically but he did see the same things I had chosen and it was right. Still, I felt much better going through it all verbally with him on the phone and now the document does have all that I ordered.