I was at the site on Saturday, and because no one was there I was able to get a pretty good look at what was going on. The contractor is moving along at a decent rate of speed, with interesting results, at least for us supercharging geeks! So far, in the upper lot there are nine back-in electrical stubs on the far right as shown in the photos taken by EGK1 (only eight shown in the last photo), and as mentioned before, what appear to be five pull through stubs on the left, shown in photos one and two. What is also intriguing are two (so far) pedestals located in the lower parking lot. That surprises me, as I thought all 26 chargers were going to be in the upper lot! Time will tell.