Supercharger - Darien CT Rest Area

Discussion in 'New England' started by aaron.s, Jun 19, 2013.

  1. HankLloydRight

    HankLloydRight No Roads

    Joined:
    Jan 18, 2014
    Messages:
    12,345
    Location:
    Connecticut
    I stopped NB and SB today. I charged at over 100kW at the NB charger in the back part of the parking lot (the pull forward spot). No problems.

    The SB charger showed "reduced service" on the Nav screen. When I got there, two cars were charging, one was ICEd and I took the last spot next to a M3. I had a pretty full charge (since stopping NB), so all I got was 20kW for about 10 minutes, and then I took off. So it works, and it might be reduced service, but I couldn't tell.
     
    • Informative x 1
  2. mcot222

    mcot222 Member

    Joined:
    Sep 3, 2019
    Messages:
    75
    Location:
    Virginia
    Good to know. So I assume once the V3 are done they would remove the current V2. I would be really surprised if they kept them as they are close to the building and subject to iceing anyway.
     
  3. Wise Pete

    Wise Pete Member

    Joined:
    Apr 10, 2019
    Messages:
    12
    Location:
    Mohegan Lake, New York
    I drove by Darien, CT rest stops on I-95 and noticed new Superchargers being set up on both SB and NB sides. I saw 12 poles with Tesla charging signs on the SB side. It's a good addition as the 4 chargers they currently have there are very often full.

    @BlueShift @Chuq @MarcoRP
     
  4. Wise Pete

    Wise Pete Member

    Joined:
    Apr 10, 2019
    Messages:
    12
    Location:
    Mohegan Lake, New York
    #164 Wise Pete, Sep 10, 2019
    Last edited: Sep 10, 2019
    Here are some pictures of the SB construction site.

    20190909_181215.jpg
    20190909_180724.jpg 20190909_180729.jpg 20190909_180746.jpg
     

    Attached Files:

    • Like x 2
  5. MarcoRP

    MarcoRP Supercharge Info Editor

    Joined:
    Sep 6, 2017
    Messages:
    4,050
    Location:
    Montréal
    We can’t update Supercharge Info at the moment for it to be visible as an expansion in progress. There is already a thread on which @tes-s made the find so I’ll ask @Doug_G or Mods to merge this post with the other thread (link here)
     
  6. MarcoRP

    MarcoRP Supercharge Info Editor

    Joined:
    Sep 6, 2017
    Messages:
    4,050
    Location:
    Montréal
    New update for this Supercharger by @Wise Pete , with more photos, but no apparent changes since the last update. link
     
  7. tes-s

    tes-s Active Member

    Joined:
    Oct 6, 2013
    Messages:
    2,111
    Location:
    CT
    Construction on the northbound side is proceeding. 10 stalls, and looks like one will be a handicapped stall.

    Looks like they will be pouring the equipment pads today, and should have site work done next week. Then waiting on Tesla equipment and utility transformer.
     
    • Informative x 2
    • Like x 1
  8. tes-s

    tes-s Active Member

    Joined:
    Oct 6, 2013
    Messages:
    2,111
    Location:
    CT
    North is coming along. All pads and conduit are set; they have paved and planted grass. No equipment set yet.

    In this photo the blue shows where the new supercharger location is - they are using an island that was a dog poop area. Black circles show the two current supercharger locations (2 stalls each).

    Red line is approximate route of the trench they are currently digging to get power. You can make out the power poles they will be connecting to. The red blob is where they were when I stopped by. They had a guy with a jack hammer pounding on a rock or ledge, then gave up and put a hammer on their small excavator and began really pounding. That is a VERY expensive power hookup - almost 1000' I think

    upload_2019-9-21_7-3-39.png
     
    • Informative x 6
    • Like x 1
  9. MarcoRP

    MarcoRP Supercharge Info Editor

    Joined:
    Sep 6, 2017
    Messages:
    4,050
    Location:
    Montréal
    Sure looks like a long trench! Did they have to do the same for the other 4 stalls?
     
  10. tes-s

    tes-s Active Member

    Joined:
    Oct 6, 2013
    Messages:
    2,111
    Location:
    CT
    #170 tes-s, Sep 21, 2019
    Last edited: Sep 21, 2019
    The existing 4 stalls are located by the building (2 on each side), and may be connected to the building power. There is a transformer near the one on the north end, and it is possible that is for the superchargers and they ran power from there to the other one. Sort of odd that they put them in two different locations - may have had to do with the parking.

    I have circled the supercharger cabinet, the disconnect, and the location of a transformer.
    upload_2019-9-21_9-19-45.png

    Here is the other one. Cabinet and disconnect circled. The disconnects were added a couple of years ago - didn't used to have them.
    upload_2019-9-21_9-21-42.png
     
  11. SureValla

    SureValla Member

    Joined:
    Mar 15, 2016
    Messages:
    626
    Location:
    Shelton, CT
    can confirm, I stop here regularly with my pooches
     
    • Like x 1
  12. tes-s

    tes-s Active Member

    Joined:
    Oct 6, 2013
    Messages:
    2,111
    Location:
    CT
    They are still making progress on the NB side, but no sign of Tesla chargers or pedestals.

    Interestingly, the transformer pad and service boards are located at one end of the parking lot, and the equipment boards are located by the charging pedestals 1000' away. I'm surprised they did not run the 12kV primary the 1000' instead of the 480v service. There will be a lot of fat cables between the service boards and the equipment boards.

    Must be some reason - maybe not enough space for the equipment near the chargers, or maybe the utility wanted it this way?
     
  13. Lobstahz

    Lobstahz Member

    Joined:
    Aug 16, 2015
    Messages:
    68
    Location:
    MA
    I drove by all 3 of the southbound SCs on 95 in CT today, Darien, Fairfield, and Madison, and they're all at the same point.

    All construction looks complete except the SC cabinets and changing pedestals. The ground is all closed up and paving, landscaping, and signs are up, with a coming soon paper taped to them. One of these threads reported that it was expected to be complete "before Thanksgiving" and that looks very likely at this point.
     
  14. tes-s

    tes-s Active Member

    Joined:
    Oct 6, 2013
    Messages:
    2,111
    Location:
    CT
    Pulling cable today. Still waiting on V3 chargers, pedestals, transformer, meter. Northbound.

    2019-10-21 13.00.56.jpg 2019-10-21 13.00.16.jpg
     
    • Like x 3
  15. HankLloydRight

    HankLloydRight No Roads

    Joined:
    Jan 18, 2014
    Messages:
    12,345
    Location:
    Connecticut
    Just FYI.. I got 118kW today in the last (furthest from the building) stall on the SB side.

    6CB51F3D-AA42-4E66-BDE7-2B8C392895D2.jpeg
     
  16. sjg98

    sjg98 Member

    Joined:
    Aug 17, 2018
    Messages:
    101
    Location:
    Brooklyn, NY
    Any progress here, looks like Fairfield not too far up 95 got equipment delivery and is now moving along nicely..
     
  17. Lobstahz

    Lobstahz Member

    Joined:
    Aug 16, 2015
    Messages:
    68
    Location:
    MA
    Sadly no change yet. I drove by Darien SB last night hoping for progress, like what is happening at Fairfield, but didn't see anything visually different at the new SC location than when I stopped by in October.
     
  18. user212_nr

    user212_nr Member

    Joined:
    Aug 26, 2019
    Messages:
    792
    Location:
    US
    Northbound

    sc_darien.jpg
     
    • Informative x 1
    • Like x 1
  19. user212_nr

    user212_nr Member

    Joined:
    Aug 26, 2019
    Messages:
    792
    Location:
    US
    edited contrast

    sc_darien.jpg
     
    • Funny x 1
  20. tes-s

    tes-s Active Member

    Joined:
    Oct 6, 2013
    Messages:
    2,111
    Location:
    CT
    Installing and wiring pedestals Northbound today. Sorry, no pics.
     
    • Like x 4
    • Informative x 1

Share This Page

  • About Us

    Formed in 2006, Tesla Motors Club (TMC) was the first independent online Tesla community. Today it remains the largest and most dynamic community of Tesla enthusiasts. Learn more.
  • Do you value your experience at TMC? Consider becoming a Supporting Member of Tesla Motors Club. As a thank you for your contribution, you'll get nearly no ads in the Community and Groups sections. Additional perks are available depending on the level of contribution. Please visit the Account Upgrades page for more details.


    SUPPORT TMC