You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Site is cleaned up. Construction crew has moved on to other jobs for now. This is a unique site, with two transformers and feeds off of two different circuits. That also means two switchgear cabinets and two meters. At this point looks like the site construction finish (primary trenching) is on hold until the utility installs a pole or two.
This is shows what appears to be the end of the primary conduit trench, awaiting a future pole addition somewhere nearby before being completed.
This site isn't open yet, but the Tesla findus map appears to have leaked some future info that this site may be getting MagicDock... As a not yet open location, the pin position isn't where the supercharger is being built.