You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
That’s surprising. I was also told a second location off of AC was going to be built. So maybe they’ll move it maybe they’ll fix it. One at the Farley plaza would be great. Forget if I mentioned that already.
still no power unfortunatelyAnybody been here lately...
So close but yet so far!
Wonder what the hold up is?
Ugh. So painful.
Drove by this location last night on ac expressway going 60mph, no heat on, barely made it home.... Had a tear in my eye as I shivered and watched countless cars pass me by.
Lmfao. I’m about 10 mins from the Deptford mall, next time stop by I’ll give you some 50 amp charging to help you get home.
@Cuttin was able to get home. He just needed to "slow-down" to 60mph, which is 5-over the speed limit, by the way. Had he stopped to charge on your 50A and drove 75 mph afterwards, he still would have gotten-home much faster going 60 and not stopping.
Lmfao. I’m about 10 mins from the Deptford mall, next time stop by I’ll give you some 50 amp charging to help you get home.
@Cuttin was able to get home. He just needed to "slow-down" to 60mph, which is 5-over the speed limit, by the way. Had he stopped to charge on your 50A and drove 75 mph afterwards, he still would have gotten-home much faster going 60 and not stopping.
Meter still not installed. Photo from PlugShare View attachment 491080
View attachment 491990
PSE&G here today, spoke to the guy he said he just finished up all the wiring today and said it is now ready for power and a meter. He said we're probably a few weeks to a month away for it being turned on and ready to go
Apparently the township is making them submit paperwork after each step before they can move forwardGreat work man!
Did he say why so long?
Apparently the township is making them submit paperwork after each step before they can move forward