Hmm. While I'm happy there will be an SC close to where I live, as a local, that is about the last place I would have wanted it to go - in a casino parking garage.
Agreed and I posted such in the local FB but was informed that the ramp in the garage is a straight shot up so there’s very little maze running to find it. But yes, ground level open parking is preferred.

We’re getting adding a ton of chargers here in Vegas!

1BA00DF9-978D-434C-B976-1CA401E4D2C4.png
 
  • Like
Reactions: Big Earl
Somewhere on the back side of "the District" would have been better, but I don't think this location is that bad. The garage it's in has a fairly easy entrance and exit and it's connected to the food court area of the casino, which has a Starbucks, Fatburger, pizza place and a couple other food options. Of course there are full restaurants in the casino as well ranging from moderate to high end (Hank's). And if you really want to go to the District instead, it isn't much of a walk.

The hotel has had HPWCs for ages (at least 7 years now), but unfortunately they are valet only. I was surprised they didn't install more that were non-valet in recent years, but a supercharger will work just fine for my purposes :)
 
I checked on this site on the fourth floor on the North parking garage and we have a fence! Not sure how long it’s been there. No construction materials in sight though. The spots on the floor below were blocked off too (presumably because the conduit will be running on the ceiling of the third floor.

There is also a fenced off area with the privacy screen on the south parking garage (see picture), along Paseo Verde. No equipment there either.
 

Attachments

  • IMG_4028.jpeg
    IMG_4028.jpeg
    556.7 KB · Views: 116
  • IMG_4027.jpeg
    IMG_4027.jpeg
    541.2 KB · Views: 95
  • IMG_4026.jpeg
    IMG_4026.jpeg
    431.6 KB · Views: 107
Happy Halloween. The site looks "finished" in that the cabinets all seem to be in place, almost all of the construction stuff is gone (just a few bags of Quickcrete remain). All the conduit on the floor below looks to be completed, and the feeder conduit from the main power source comes up to the third floor from the underside of the down ramp.

ETA the areas are still fenced off though.

I cant really tell where the transformers are, so I cant tell if that is what is the last item or not, or if we're just waiting for commissioning or something like that.
 
Happy Halloween. The site looks "finished" in that the cabinets all seem to be in place, almost all of the construction stuff is gone (just a few bags of Quickcrete remain). All the conduit on the floor below looks to be completed, and the feeder conduit from the main power source comes up to the third floor from the underside of the down ramp.

ETA the areas are still fenced off though.

I cant really tell where the transformers are, so I cant tell if that is what is the last item or not, or if we're just waiting for commissioning or something like that.
If you follow the conduit it’ll take you to the transformer(s). The Henderson permit website is kinda wonky, not seeing a “inspections” page. From previous experience it seems once the fencing comes down it’s waiting for transformer or commissioning. Either way, days to weeks left. Thanks for checking status on it though!
 