Drove by today and was turned away from charging due contruction crew still working on the site. They were installing metal railings around the walkways and bollards around the electrical cabinets. Most of the landscape is complete with astroturf in the front and the crew moving landscape rocks around the cacti. No parking lines or end stops for each charging spot. The lounge looks almost done from what I could see from the sidewalk; they have seating, drink amenities and a mini gallery for Solar/Powerwall (with one on display). The parking spots between 2B and 3A now have HPWCs. I talked with some of the crew working on the site and they mention that it should be all wrapped up before the holiday.
Here is a nice album of pics that I took while I was there:
Tesla Supercharger Kettleman Cit
So one has to wonder when the invites will be sent out for the grand opening of this next-gen facility?