I stopped by yesterday and noticed that a goodly section to the right (east) of the park and ride lot was fenced off by a construction crew. They had poured a concrete pad and trenched along the back of the lot. There was gravel in the trench and numerous, PVC electrical conduits coming up out of the ground near the concrete pad. I didn't take any pictures because the construction guys looked at me funny as I watched them. I suppose I could have asked what they were making, but, well, I was too shy, lol. I didn't see any Tesla-specific equipment and the whole lot is still somewhat rough, so I can't definitively say this is the beginning of construction. I'm traveling between Boston and Houlton again this weekend and perhaps I'll stop in, but given the location of the trenching along the back perimeter of the lot and next to the park and ride area, along with obvious underground electrical work, I'd bet this is the Supercharger. I'm just not sure enough of it to suggest the status be updated to CONSTRUCTION at Supercharger.info.
Have a great weekend all.
Yeah, there's currently also supercharger construction at 4 other Irvings across the border in Canada (3 in New Brunswick, 1 in Nova Scotia). It wasn't a very big leap.Well somebody thought it was enough info to put on supercharge.info
i like your optimism.I get the sense that the currently under construction sites in Maine and eastern Canada are all getting prepped for a shipment of charger cabinets (V3 from NY giga). Even after they are all delivered and installed there will be a wait for connection. I’m guessing about another month before we can be charging and scoping out the rally route.
I get the sense that the currently under construction sites in Maine and eastern Canada are all getting prepped for a shipment of charger cabinets (V3 from NY giga). Even after they are all delivered and installed there will be a wait for connection. I’m guessing about another month before we can be charging and scoping out the rally route.
Limited. Tesla uses ATT as do we, and coverage north of Old Town is often problematic.I have a question with the maps and nav in the tesla in that area because any time I have driven north of Old Town I am not connected with my phones, I have purchased a hotspot that uses verizon to get data in the Medway area. Does tesla have data in the medway area?
I suspect they are suffering the same fate as Woodstock, Salisbury, Quispam (I think) and Baileyville. The work mostly done, just need the actual pedestals which seem to be hard to come by.