Decided today to visit both the Early and San Angelo sites today.
San Angelo does appear pretty much done with the exception of the transformer not being in place yet as stated in some previous posts. The cabinets and posts are installed. Doesn't look like they went with pre-fabs on this install. Here is a pic of the whole site as of today. It will be 8 v3 stalls.
San Angelo does appear pretty much done with the exception of the transformer not being in place yet as stated in some previous posts. The cabinets and posts are installed. Doesn't look like they went with pre-fabs on this install. Here is a pic of the whole site as of today. It will be 8 v3 stalls.