Thekuai
Member
Is this operational yet?
I took this picture on 6/10/23. Looks like they opened up the ground again and still no meter
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Is this operational yet?
Thanks for the update. So it looks like this is still a few months away from opening.Went by there a few minutes ago (Sunday, June 25)…
Still not active, but that hole they opened up has what looks like conduit lines now. As you can see in the photos (I think…lol) there are six large lines coming from the parking lot and five that are right under the electric boxes that serve the station.
Also, there are all sorts of markings in the parking lot that go from another large electric box behind Stop and Shop all the way to where those six tubes emerge by the supercharger station.
It looks like the electric is about to be hooked up. I’ll go by again later this week.
Not a problem. I live less than ten minutes away and pass by at least a couple times a week. I don't think this is months away, maybe a couple weeks at best, probably end of July.Thanks for the update. So it looks like this is still a few months away from opening.
I like the way you think.Went by again this morning. No change- the large conduits are still waiting to be hooked up to the charging station and to the power source behind the Stop and Shop.
I did tape this to the charging station's transformer....lol. I'll check back later next week to see if we get an answer.
View attachment 954357 View attachment 954360
Were you the guy who came from stop and shop with the white model x plugged into one of the supercharges?So we have a little bit more progress as of today. The conduits that were waiting underground are hooked up to the supercharger transformers as the photo shows. At the other end however, those same lines remain waiting to be connected to the power supply on the side of the Stop and Shop.
Oh...my sign is still there, but no one has written in a date or anything else as of yet...lol.
View attachment 955684
Yup Tesla updated the website from Q2 2023 to just 2023 so this won't be ready for a few monthsThe back of the store where the connection to the grid still has to be made still needs alot of work it seems.View attachment 956297
It really is a bit ridiculous that almost all the physical structure goes up in a matter of a couple weeks to a month, and then takes six more month to do the last few steps.Yup Tesla updated the website from Q2 2023 to just 2023 so this won't be ready for a few months
I wonder if the electrical connections were made at the other end- on the side of the Stop and Shop- to the transformer box there. Definitely going to drive by tomorrow morning.Some progress I guess? I'm guessing underground work was done and fill was put in. Still no meter.
View attachment 963567
They were not. Still open conduitI wonder if the electrical connections were made at the other end- on the side of the Stop and Shop- to the transformer box there. Definitely going to drive by tomorrow morning.