From Sacramento City
Type
Planning/Design Review/DR Files/DR Files
Status
Approved
Date
04/11/2017 00:00:00
Address
3668 N FREEWAY BLVD, SACRAMENTO, CA 95834
Applicant
Kevin Provance
Description
A request for Site Plan Review for the installation of 10 electric vehicle charging stations and associated appurtenances. Staff level Site Plan Review with Public Works Minor Project Review is requested.
I was a bit concerned about the slow charging issue before going through Vacaville last weekend. However, the charging was fantastic for me both times - Saturday ~10am (with no other cars) and Monday ~3pm (all stalls full). Both times the power was normal. I was on 1A both times.
They are putting the finishing touches on the pedestals today - wiping them down and cleaning. I spoke with one of the workers and he said "soon, but not today."
They are putting the finishing touches on the pedestals today - wiping them down and cleaning. I spoke with one of the workers and he said "soon, but not today."
Looking good! I see they did mark the wide stall as a handicapped space. I thought about starting a rumor that is was reserved for the Tesla Semi-truck.
They are putting the finishing touches on the pedestals today - wiping them down and cleaning. I spoke with one of the workers and he said "soon, but not today."
Vacaville has rarely been full, at least during all the times I've used it . I once got 25kw but because I picked a paired stall. Moving to an unpaired one fixed that.
The cabinets pictured are the Supercharger cabinets and they are water cooled. The transformer is provided by the utility and it is usually oil cooled. The switchgear is in separate cabinets and typcially don't dissipate enough power to require cooling of any kind.