The whole site has been down for this project. It seems possible that at least the original V2's could be back up by this weekend (I still think those just need the utility to reconnect the site to the grid) which potentially could be immanent given the supercharger cabinet's have now been fenced.Are the old chargers still working? I'm going to be in that area on Sunday.
I suspect the majority of the crew might now be working East Templeton, with a smaller crew left behind or returning to West Lebanon as needed to finish it up. East Templeton is a pre-fab build, and they probably have a delivery date for the equipment pinned on a calendar and need to ensure the site is ready when it arrives. The prefab superchargers are dropped in place by a crane from the flatbed they arrive on, so that needs to be 100% ready to receive them when the truck arrives.