detlefo
Member
Have you got some inside information? Hasn't snowed up there in years!:wink:
Sure, I'll share http://opensnow.com/dailysnow/tahoe
I guess I'm an optimist:smile:
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Have you got some inside information? Hasn't snowed up there in years!:wink:
According to Tesla it is supposed to be on line by the end of the year, given the problems encountered at other SC locations it is anybody's guess. If the paperwork is done and authorized I would think sometime in late December.Anybody care to speculate as to when Petaluma is likely to be operational? How long does it usually take from this point? I'm planning to be in the area from mid-December until just after Christmas.
@ecarfan
That photo doesn't look like the outlet mall. Where is it in Petaluma?
I was in Healdsburg a couple of weeks ago. Chargepoint stations are all over the place. Not as fast, but convenient.
It is called the Washington Place Shopping Center and it is right off 101 and Washington street. There is a Dicks sporting goods a Target, Homegoods and several resturants including Panera bread.@ecarfan
That photo doesn't look like the outlet mall. Where is it in Petaluma?
I was in Healdsburg a couple of weeks ago. Chargepoint stations are all over the place. Not as fast, but convenient.
I stopped by the Petaluma SC this foggy morning. Didn't look like much progress since Monday, but here are some pictures anyway:
View attachment 64736
View attachment 64737
Definitely looks like 4 pull in spots behind 4 back-in spots.
Looks like Petaluma could also be 8 pull-in spots, 4 from each side.
What I find curious is that there appear to be 5 Supercharger Cabinets in the Equipment Enclosure, 4 together and 1 beside the Distribution Center for 8 Charging Stalls. With 5 Supercharger Cabinets, there would usually be 10 Charging Stalls.
New photo showing little progress. Still no transformer or pavement, but now there are 9 spots, which explains the fifth cabinet. The whole worksite is terribly muddy, so it may be some time drying out before any further progress.
View attachment 65158Thanks for the update, did not go by because of the weather and I figured not much could be done in the rain. Does not look good for the next 5 to 7 days.