LongRanger
Active Member
20m trench dug between outbuilding and charger location and 10mm2 SWA cable buried today, that’s the messy bit done. Electrician was also here to sign off on correct depth / confirm warning marker tape etc.
Poor fellas doing the job got completely drowned, terrible weather !
Internal/external wiring being done in next week or so.
Poor fellas doing the job got completely drowned, terrible weather !
Internal/external wiring being done in next week or so.