I have heard and read the Posts about rolling back the Charge rates of 85 KW Batt Packs from earlier years but have not seen any comments about 70,75,and 90 Packs. We're they all sent the update that slowed Charging. If so, how much are we talking? I'm Retired and am looking to get 1st EV for trips and Tesla still has best SCharge structure. Don't mind longer Trips timewise to Charge but don't want to sit at Charger for an hour to Drive 2 hours.
I am looking at 2015-17 Duel Motor S since prices are low and $4000 cash from Government. Even if Car needs Batt down the road I'm OK with that since Aluminum body I don't have to worry about Rust. We keep our Cars for 15 years plus and being X Master Tech I d most work myself (not HV or software).
Thanks in advance.
P.S. I did check for other Posts but not exactly answers I needed
I am looking at 2015-17 Duel Motor S since prices are low and $4000 cash from Government. Even if Car needs Batt down the road I'm OK with that since Aluminum body I don't have to worry about Rust. We keep our Cars for 15 years plus and being X Master Tech I d most work myself (not HV or software).
Thanks in advance.
P.S. I did check for other Posts but not exactly answers I needed