jacksyd2022
Member
The one in the video is glovis companion which departed for EUHopefully its glovis century that they are talking about. The one the left from yantai.
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
The one in the video is glovis companion which departed for EUHopefully its glovis century that they are talking about. The one the left from yantai.
Very interesting..... where did you hear about that, @Prey4insanity, and do you know if there are any more, or just an isolated case?Another Vintrickle happening now. Order made as latest as 4:30pm on day 1 now have the VINs.
I ordered on day 1 at 2:54pm and I got my VIN assigned with EDD of Sep 22 - Sep 30. Someone who ordered around 4:30pm on day 1 has a VIN too now.Very interesting..... where did you hear about that, @Prey4insanity, and do you know if there are any more, or just an isolated case?
Last night my EDD changed from Nov-Feb to September 20 with VIN assigned. Ordered 4:30pm on open dayI ordered on day 1 at 2:54pm and I got my VIN assigned with EDD of Sep 22 - Sep 30. Someone who ordered around 4:30pm on day 1 has a VIN too now.
Same here, ordered at 12:51 on day 1 and can't wait. EDD 17 to 31 Aug.The wait is killing me. Ordered 12.30 day 1. VIN assigned since last week. EDD 22 Aug - 5 Sept. Account fully paid. But no text yet,
Seriously unfair , i ordered at 11:30 on day 1 in Brisbane , my EDD still sept 8-18, What is your build date?Same here, ordered at 12:51 on day 1 and can't wait. EDD 17 to 31 Aug.
They could have shipped them.Time to go ship watching
Glovis Century (slim chance Tesla trucked cars to Yantai) is docking in Brisbane today, and tomorrow we'll know if it's headed to Port Kembla.
Asian Vision (confirmed Tesla ship) is arriving in 10 days in Brisbane also.
i think Asian Vision is going to Port Kembla directly , Also Glovis is not due in port till 21st , it would be anchored somewhere along Caloundra for next 4days .I think asian vision would reach port kembla ahead of glovis . Also Glovis is docking in brisbane for short period . My guess it does not have any tesla's . Asian vision left nenang terminal so most likely that is our lucky gooseThey could have shipped them.
31/7Seriously unfair , i ordered at 11:30 on day 1 in Brisbane , my EDD still sept 8-18, What is your build date?
mine is same so basically one of our EDD is wrong . I wish mine is wrong . was you edd always 17th Aug or it moved ahead later. Also weirdly my invoice have no odometer reading31/7
My odometer says 3 km. I keep checking the VicRoads site to see if the rego has gone through.; But not yet.mine is same so basically one of our EDD is wrong . I wish mine is wrong . was you edd always 17th Aug or it moved ahead later. Also weirdly my invoice have no odometer reading