jelloslug
Active Member
I was there last Monday and Wednesday and it was the same way, the entire lot was full with transports trucks still unloading.I was just over at Tesla Charlotte - they had literally 95 Model 3’s with overflow from Greenville . They are doing 11-12 deliveries per day. They said they are hoping to do group deliveries at 10 per hour in near future . The bottleneck is in contracts and trade in teams .