It may be good to devote a thread to following the Bloomberg Model 3 Tracker.
Bloomberg Model 3 Tracker
Current as of Aug 24, 2018 indications are 6278 per week and 75,910 cumulative.
What might this tell us about Q3 production? Cumulative at end of Q2 was 41,030. So 54 days into Q3 has 34,880.
This is an average rate of 646/day or 4521/week. Extending this average rate out over 91 days in Q3 arrives at 58,779 as a conservative projection.
As an alternative, suppose that for the remaining 37 days of Q3, Tesla averages the current rate of 6278 per week. This is 33,148 over the remaining 37 days, leading to a Q3 total of 68,084.
Tesla guided 50k to 55k for Q3. So far 35k is done 54 days into the quarter. The two extrapolations above suggest that 59k to 68k are plausible.
Bloomberg Model 3 Tracker
Current as of Aug 24, 2018 indications are 6278 per week and 75,910 cumulative.
What might this tell us about Q3 production? Cumulative at end of Q2 was 41,030. So 54 days into Q3 has 34,880.
This is an average rate of 646/day or 4521/week. Extending this average rate out over 91 days in Q3 arrives at 58,779 as a conservative projection.
As an alternative, suppose that for the remaining 37 days of Q3, Tesla averages the current rate of 6278 per week. This is 33,148 over the remaining 37 days, leading to a Q3 total of 68,084.
Tesla guided 50k to 55k for Q3. So far 35k is done 54 days into the quarter. The two extrapolations above suggest that 59k to 68k are plausible.