Tesla Model 3 progress: production line layout completed, Tesla now testing subsystems
From the 3Q letter to shareholders:
From the 3Q letter to shareholders:
"Gigafactory construction and Model 3 development both remain on plan to support volume Model 3 production and deliveries in the second half of 2017."
"For Model 3, we have completed production line layouts and will soon begin installation of new body welding and final assembly lines. We have established a world class team of suppliers for Model 3 production equipment and components and critical long lead time equipment and components have been sourced. We are now testing vehicle systems such as chassis, the high voltage drive system, and low voltage subsystems such as vehicle controllers, HVAC, infotainment and lighting. As refinement of the Model 3 continues, we remain on plan for our timing, volume, vehicle capability, pricing, and margin targets.”
Last edited: