Thank you
East West array so 2 lots of scaffolding. Coming in at 1700 just for scaffolding
900 labour charge listed on the quote. I think I'm being overcharged for parts. Looking at the figures, I might bring the system down from 6kwp on both the front and back of the house to a 4kwp system on just the back. I need to talk to them to get a definate cost, but I think it would be in the region of 11k for that system. Would then need to draw on the grid, but I'd be hopeful I could do this on the cheap rate filling the battery, then drawing from the battery during the day