Thanks, for the update. Keep us posted PLEASE. I do need to get up to Chico every once in a great while, and it would be so handy to have fast charging there to allow more flexibility in my travel options going onward rather than back to Sacramento.
I firmly believe that perhaps HALF the value in any Tesla vehicle is in their charging network (compared to any other brand). I am a ONE CAR household and only Tesla really works to meet all one's driving needs.
And this Chico install seems to want to challenge THE RECORD for the longest time between permitting and final opening, if not the absolute longest, it has to be in the "top 5?" Not the "top 5" that we mostly want to achieve.
I firmly believe that perhaps HALF the value in any Tesla vehicle is in their charging network (compared to any other brand). I am a ONE CAR household and only Tesla really works to meet all one's driving needs.
And this Chico install seems to want to challenge THE RECORD for the longest time between permitting and final opening, if not the absolute longest, it has to be in the "top 5?" Not the "top 5" that we mostly want to achieve.