The empty pad is for the utility transformer which apparently hasn't been installed yet and while the meter housing box is in place, the actual meter isn't in. No surprise the meter hasn't been installed when the site isn't connected to the electrical grid yet.Still not live.
See pics. Looks like there is a space for something to attach to something... Also there is a meter, see pic. But looks like you can see it on old pics too. Maybe need a different meter? Idk.
Very frustrating!
View attachment 495690
View attachment 495694