I stopped by over the weekend and there still wasn't a meter installed. The Model S was gone as well.Headed up there today will update with likely no change
Will the Black Model S that's plugged into a Supercharger that doesn't charge still be there? Stay tuned!
I have put an inquiry in with Deptford Township for some answers. Once I hear anything I'll post an update. This is just crazy at this point. It's been ready to go for months.This is crazy. There has to be something holding it up. Did anyone call the township to get some intel?
No response from Deptford Township yet. Seems like no one knows what's going on.I have put an inquiry in with Deptford Township for some answers. Once I hear anything I'll post an update. This is just crazy at this point. It's been ready to go for months.
Usually meter==powered but it’s very clear from that picture it’s not receiving any power. Very odd.Hey Guys,
Good news. I stopped by today and PSE&G has installed the meter! Does anyone know how long until they turn it on?
Hey Guys,
Good news. I stopped by today and PSE&G has installed the meter! Does anyone know how long until they turn it on?
This whole location is odd. Normally the meter would be reading something, in this case it isn't.Usually meter==powered but it’s very clear from that picture it’s not receiving any power. Very odd.
I don’t think that’s that unusual. I don’t think it’s always the case that meter == power on because first you have to install the meter, then you turn on power to the meter, then you turn on power to the stalls.This whole location is odd. Normally the meter would be reading something, in this case it isn't.
The meter is owned by the utility. Generally, the meter itself is the switch to connect the utility to the customer equipment.I don’t think that’s that unusual. I don’t think it’s always the case that meter == power on because first you have to install the meter, then you turn on power to the meter, then you turn on power to the stalls.
but I would say it would be reasonable to expect this to be up and running within 30 days now.
That makes sense. I think everyone is happy this is going to finally come online. Once I see everything is up and running I'll report back here when there is updates.The meter is owned by the utility. Generally, the meter itself is the switch to connect the utility to the customer equipment.
I think we can all agree that it looks like its opening is finally immanent. (Will I regret those words lol?)That makes sense. I think everyone is happy this is going to finally come online. Once I see everything is up and running I'll report back here when there is updates.
Hahahaha, who knows. Only time will tell.I think we can all agree that it looks like its opening is finally immanent. (Will I regret those words lol?)