ibdb
Any excuse for a road trip
If something is happening, I didn't see it. There is a vacant business across the street from the coffee shop, but it's a small lot with an existing building that wouldn't seem a good fit.
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Darn, thanks for looking. I’m heading a different direction otherwise I’d prowl around. There is supposed to be a CCS/Chademo DCQC going in soon as well, but probably not for another month or so. So, keep a lookout. Again, I couldn’t find a permit for either, so maybe I’m a bit premature.If something is happening, I didn't see it. There is a vacant business across the street from the coffee shop, but it's a small lot with an existing building that wouldn't seem a good fit.
Noooooooo, the Fred Meyer parking lot is very congested, small, and difficult to get in/out. Sorry @rpo I scouted it out months ago and it would be iced worse than the one at Holiday Inn, which has a completely full parking lot most summer weekends. The only viable locations are new construction at the Canyon Rd exit (Umptanum, S. Opportunity, etc.) or W. University exit (Hampton Inn or nearby). South on Canyon is literally a DUMP ( Day Inn & Waste water plant). This exit also has to contend with railroad tracks on one side.
I got a bit more info on the Cle Elum rumor. Definitely Pioneer Coffee with construction to probably start in late September. Tesla wanted 20 stalls, but not enough room, so I’m guessing the empty spot just north of Pioneer facing 101 W. 1st. Until we find a permit, it’s probably too early for a separate thread.This would be awesome news! The Pioneer Coffee Roasting Company is a fantastic little coffee shop.
Anybody have an update on how busy the Ellensburg supercharger was on Labour day? The Telsa nav said it was full 5/5 when we passed it at about 11:30 am. We had a full charge in Moses Lake and made it to Lynnwood with 30% left.
Ok, well I kinda missed the "late September" date, but hey it's Tesla so maybe it's not really late yet. Definitely some issues still holding up the plans. First it was the snow load on some equipment, and now it's an issue with being in a floodplain (hmmm, maybe Tesla will need to pay for raising all of Cle Elum by one or two feet). Given these nitpicking issues, I'm less confident that anything will happen before winter.I got a bit more info on the Cle Elum rumor. Definitely Pioneer Coffee with construction to probably start in late September. Tesla wanted 20 stalls, but not enough room, so I’m guessing the empty spot just north of Pioneer facing 101 W. 1st. Until we find a permit, it’s probably too early for a separate thread.