Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Supercharger - Islandia, NY

This site may earn commission on affiliate links.
Spotted by Chris R on Tesla Owners Worldwide in FB!

29354603_367521957081988_8670880123855106599_o.jpg


29695470_367601080407409_6970853008789688647_n.jpg


Exciting times for Long Island residents :) Thread discussing the Plainview location: Supercharger: Plainview, NY (Long Island)

upload_2018-4-1_8-30-39.png
 

Attachments

  • upload_2018-4-1_8-27-16.png
    upload_2018-4-1_8-27-16.png
    235.1 KB · Views: 193
Great to see, I heard it was going to be 10 stalls, we shall see !
There are 5 cardboard boxes of charging bollards in the photo. They normally contain two each, which would be 10. If another photo shows 5 superchargers (if there are three white SC cabinets behind the two shown in their plywood crates), that would confirm 10 stalls.
 
  • Like
Reactions: HollywoodNY
Progress! I can’t tell if it’s all hooked up but looks like the station could be hours away from going live! We shall see what the next few days bring.
 

Attachments

  • F36D5F06-B5CE-4DE1-B693-CFCAF75EB954.jpeg
    F36D5F06-B5CE-4DE1-B693-CFCAF75EB954.jpeg
    893.9 KB · Views: 155
It's a lot more than hours. There are no numbers on the stalls yet. (Sign Tesla has been there)

Have you looked for the transformer, and the meter?
Is the meter powered?

Until those things are done, Tesla won't be able to do their scheduling of a test and calibration of the site.
 
  • Informative
Reactions: Chuq
Went there yesterday. Still no transformers or utility meter. Probably another week maybe two before it gets powered up. This charger will help us huge on our trips to the island. It’s about 10 mins away from where we stay.
 

Attachments

  • 159A084D-6843-4C3E-B77E-BEBE6E0FA862.jpeg
    159A084D-6843-4C3E-B77E-BEBE6E0FA862.jpeg
    336.4 KB · Views: 104
  • BD9E562C-8128-43B5-9AAB-101730F18CD1.jpeg
    BD9E562C-8128-43B5-9AAB-101730F18CD1.jpeg
    398.1 KB · Views: 113
  • 8811934D-56BF-443D-8F90-C2C632D4528F.jpeg
    8811934D-56BF-443D-8F90-C2C632D4528F.jpeg
    379.8 KB · Views: 100
Looks like the autotransformers are also missing (that last picture), if they even need them. I think 1 week is zero chance, and more that two is very likely.
Took this the other day, still has blue tape on top of each SC.
View media item 118355


5-21-18, Islandia, NY Supercharger. The only thing missing is electricity!. Great to see this going in near my office.


IMG_20180518_095723.jpg