Easy there, pardner. This one hasn't even opened yet.Now we need Carlsbad....
You're supposed to wait until it opens before demanding new locations (which are inevitably outside the topic of this thread).
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Easy there, pardner. This one hasn't even opened yet.Now we need Carlsbad....
You would have done well in the model 3 lr. I charged my model y lr few weekends ago. 2 hrs each day while staying at nearby hotel was more than plenty to drive around and make back to van horn SuC. I’ve taken our 2016 MX 90d with far less range into some out of network areas and never worried. Use PlugShare. Have an adventure. Charging has been getting better and easier.That would be amazing. I am actually in Carlsbad right now but still too nervous to try the trip in my Model 3 LR. It’s not convenient to stop at the RV park or a McDonald’s for a few hours
Weeks to months, it’s all over the place. Usually they’re built relatively quickly but it’s the transformer delivery that holds them up. There’s a huge shortage and every build needs one.Happy to see some active work taking place. Has anyone else tracked any other Supercharger builds ? About how long does it usually take for one of this size to be built and up and running ?
Construction times are highly variable. When they use prefab units the site can be up and running in a week or two. Otherwise two weeks to a month seems typical for construction. Even after construction is finished, opening can be delayed while the local electric utility places the big transformer needed and local inspectors sign off on the installation. Of late, Tesla techs have been pretty quick about doing the final checks and turning the new sites on.Happy to see some active work taking place. Has anyone else tracked any other Supercharger builds ? About how long does it usually take for one of this size to be built and up and running ?
I was just there about 2 weeks ago and did a drive-by of the site. Relative to your last picture I didn't see much progress so I didn't take a picture. I won't be back over to Cruces until mid-June. I've been hoping it would be done by then so I can use it on my way to Ruidoso.I haven’t had a chance to pass by. Has anyone else passed by and saw any progress ?