As according to post #154, "The construction superintendent projects completion date of Nov 25th, but has a goal of Nov 1st."Any idea of timeline on completion? Thanks!
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
As according to post #154, "The construction superintendent projects completion date of Nov 25th, but has a goal of Nov 1st."Any idea of timeline on completion? Thanks!
As according to post #154, "The construction superintendent projects completion date of Nov 25th, but has a goal of Nov 1st."
I am curious - you heading along I-55? Is your destination Memphis, or is it along the way? What are your thoughts on the length of detour from I-55 (12 miles each way from I-55 and I-240 intersection, which most times of day should take at least 20 minutes and during rush hour closer to 45 minutes, each way)?I would use it on Monday, if it was ready.
I go to Memphis sometimes (St Louis is an hour closer), but really I want to go see family in Little Rock and Hot Springs. I have a 90D, can charge at either destination, on a 220 situation. Memphis is a critical link from St Louis to Florida, or West.I am curious - you heading along I-55? Is your destination Memphis, or is it along the way? What are your thoughts on the length of detour from I-55 (12 miles each way from I-55 and I-240 intersection, which most times of day should take at least 20 minutes and during rush hour closer to 45 minutes, each way)?
I assume Tesla choose the location because that is where the money is in Memphis?
Both Truckee-1 and Hawthorne have had crime problems. Not to discount your point.More likely they want a safe location. Their SC's are in service 24/7 and they don't want loiterers harassing the owners. I've never heard any reports of crime around SC's. I bet that Tesla reviews the crime stats before siting a SC.
I agree with you. If you are traveling East or West on I-10 in Houston, you had to drive 20 miles North to get to the Supercharger. They just recently completed a SC in Channeview TX about 15 miles East of Houston on I-10.Given enough time major metropolitan areas will have Superchargers located near the most heavily traveled routes in and out of the city.
View attachment 198835
Stopped by late AM today; around here that's known as 'church time' so no work going on. They've made further progress; I'd guess they're right on schedule to open in 2 more weeks, pending transformer issues. I have lots of new photos which I may post once I've had a chance to make sure they're worth posting.
Looks like all underground work is completed except at the pole, fill placed but not yet packed. Then concrete. As previously shown, 2 of the switching stations and 4 chargers standing by, ready to be unpacked and installed.
Both Truckee-1 and Hawthorne have had crime problems. Not to discount your point.
Having traveled to NY/Canada 2 times, the new Memphis SC location distance from I55 is not bad at all just 10 miles each way. Many times I have had to travel more than 10 miles to get to a SC that was not on my route.I agree with you. If you are traveling East or West on I-10 in Houston, you had to drive 20 miles North to get to the Supercharger. They just recently completed a SC in Channeview TX about 15 miles East of Houston on I-10.
Good info, thanks!I feel sure I am leaving something out and may not be using correct terms, but here are the basics to watch for when following construction of a supercharger site. There will be cabling laid connecting battery packs to mounts at the location of the individual charging stations. All of that is covered by concrete basically making a slab. The individual charging stations are prefabricated and fitted to the mounts. The prefab battery packs are connected with prefab inverters to convert AC from the grid to DC to go into the packs. Usually the battery packs and inverters are enclosed in a fence. The inverters are connected to the grid through a transformer and there is a meter showing how much electricity is being used. So the subjects for the photographs are as follows: The cabling and the concreter slab enclosing it. Usually first and appears to be what is being built in the pictures at this site so far. The mounts for the charging stations and the charging stations. The inverters and battery packs and the fence enclosing them. The meter and the transformer. So when you take photographs at the site include whatever of these items are present as time goes on and you will give a pretty accurate picture of the rate of progress of construction. As construction ends, there are more nuanced things which can be spotted from these photographs. I posted pretty extensive photographs when I tracked construction at Shreveport; you might want to refer to that threadl
The fastest construction crew Tesla uses appears to be the one out of Mandeville, LA, which completed Shreveport in about two weeks. One delay which sometimes happens is caused by the power company delaying installing the transformer. Usually green and on a separate slab on the ground it is sometimes some distance from the rest of the site's equipment as in Alexandria LA (about half a block).
While that is quite comprehensive, there is something that should be corrected. You frequently mention battery packs. Out of the many hundreds of Supercharger stations around the world, you can count on one hand the number of sites that have battery packs. It's only about 2 or 3 of them I think. The VAST majority do not.I feel sure I am leaving something out and may not be using correct terms, but here are the basics to watch for when following construction of a supercharger site. There will be cabling laid connecting battery packs to mounts at the location of the individual charging stations. All of that is covered by concrete basically making a slab. The individual charging stations are prefabricated and fitted to the mounts. The prefab battery packs are connected with prefab inverters to convert AC from the grid to DC to go into the packs. Usually the battery packs and inverters are enclosed in a fence. The inverters are connected to the grid through a transformer and there is a meter showing how much electricity is being used. So the subjects for the photographs are as follows: The cabling and the concreter slab enclosing it. Usually first and appears to be what is being built in the pictures at this site so far. The mounts for the charging stations and the charging stations. The inverters and battery packs and the fence enclosing them. The meter and the transformer. So when you take photographs at the site include whatever of these items are present as time goes on and you will give a pretty accurate picture of the rate of progress of construction. As construction ends, there are more nuanced things which can be spotted from these photographs. I posted pretty extensive photographs when I tracked construction at Shreveport; you might want to refer to that threadl
While that is quite comprehensive, there is something that should be corrected. You frequently mention battery packs. Out of the many hundreds of Supercharger stations around the world, you can count on one hand the number of sites that have battery packs. It's only about 2 or 3 of them I think. The VAST majority do not.