You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
We were shopping there today and saw the signs. Two ICEd spots FWIW. So wonder if these signs mean that something didn't get installed correctly and they're going to be digging up stuff. I thought they had received approvals on everything and only had the fire department inspection and city to sign off.
Drove by this morning and saw that the green box has been installed on the pad. Didn't see any trucks and there is still tape on the charging stations. There's also a lot of trench work in the street that is adjacent to this box. I hope that the green box is for the chargers and not related to the trenching.
Still not up as of Saturday, but I see no visual evidence of any remaining work (there are two big cabinets installed on the left, plus the one on the right (shown in the photo above). Now, I guess we're just waiting for inspections?
false alarm apparently the station is in test mode, went there and tried two posts but both were off. Station looks to be in a great location though, Target is open until midnight and there's Starbucks inside. Looking forward when it opens.
And this is why it is worth checking the car nav to see if it shows a new location as open or not. Usually, new Superchargers appear on the car nav very soon after they are operational.