I have traveled over 52,000 miles in 16 months and charged at 105 different Superchargers in 24 states and my observation has been is that sometimes it takes several weeks brAFTER everything looks to be in place before the power is actually turned on. Visiting with the construction electric worker at the Laramie Supercharger he told us he was driving from Oklahoma 10 hours to do 2 hours of final work. That was a month ago and Laramie is STILL not officially open.
I am an eternal optimist, and hope to see this open this week, but the likes of Laramie & Fort Stockton and Austin keep me wondering.
It is incredible how many new chargers ARE opening every week, so we'll be able to hit the other 24 states in our happy Tesla wandering.
Model S 90D with two Model 3 reservations from Day One