You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
That's what we are hoping to do. Help accelerate large scale ev charging instructure.This is by far the best thread in the Charging Standard and Infrastructure sub-forum. So much could be learned by large venues (sports stadiums, mega churches, malls) in offering this level of charging service.
Yep first 10 stations online at mountain view high school. There will be a total of 26 and D.C. Fast charger.
When in doubt, read the OP (first post)Are these also 80A? Plugshare shows 6.6KW, so I'd assume 30A, but thought I'd check.
When in doubt, read the OP (first post)
If all spots are occupied the load might be spread out as 6 kW per spot but if demand scheduling allows a spot can pull up to 19.2 kW.
MVHS stations are 6.6kw (208v 32a). We plan to have a 50kw dcfc there as well. Yes all load balanced and managed.
Well that's the what. How about the who?PowerFlex Systems specializes in cost effective, large scale EV charging systems... =)
View attachment 234702 View attachment 234703 View attachment 234704 View attachment 234705 View attachment 234706
That's what we are hoping to do. Help accelerate large scale ev charging instructure.
We added live statistics on two 70inch monitors yesterday. We give a lot of tours of the charging facility so this will help people understand what's going on.
Card swipe is not necessary. Most likely the chademo was not fully inserted into the tesla adapter. Can you try again next time?