Hi All,
In the process of installing a charger at my workplace for a couple of M3's.
Could anybody confirm what the maximum AC charge rate if on the M3's?
I have read a lot of stuff that's conflicting, on the Pod point/Zap map website is states the maximum type 2 charge rate is 11kw??
Just want to know before I go wasting money installing 22kw chargers that we cant use the full potential of?
Thanks
In the process of installing a charger at my workplace for a couple of M3's.
Could anybody confirm what the maximum AC charge rate if on the M3's?
I have read a lot of stuff that's conflicting, on the Pod point/Zap map website is states the maximum type 2 charge rate is 11kw??
Just want to know before I go wasting money installing 22kw chargers that we cant use the full potential of?
Thanks