jebinc
Well-Known Member
Well, as some of you predicted, my EDD did narrow by a day overnight (see sig). I suspect the initial specific date range occurred when I was softly matched to a car entering the production process. The leading date algorithm seems to be "Current date plus shipping time to your location" and the trailing date seems to be the sum of (max flow); from order released to production, production, post production (finding a shipper) and travel time to your designation. Thoughts?