Elaborate on why I hate PG&E (but not as much as holeydonut)Can you elaborate?
or grid export disappeared?
For grid export, I thought I saw it in the app when I first read this thread, but now it is not there. Grid Charging is still there
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Elaborate on why I hate PG&E (but not as much as holeydonut)Can you elaborate?
So are you going to try to switch to NEM-PS and drop the insurance rider?Good news? Maybe? I dunno... but PG&E just confirmed to me that the latest form 79-1193-02 (NEM2-Interconnection) works for Powerwall systems in excess of 10 kW. The old-method required > 10 kW systems to use the NEM2-MT. But, now PG&E recognizes that the Tesla Powerwall 2 has received a Certification Requirements Decision as a qualified Power Control System.
Old form:
View attachment 914981
New form:
View attachment 914982
Here's the advice letter that authorizes the change.
So are you going to try to switch to NEM-PS and drop the insurance rider?
more solarYou betcha. I'm still planning what to do with my $200 savings per year monies. Probably need that to pay for a few days worth of natural gas.
more solar
I swear the way I'm going to go is falling of a 15' step ladder in the middle of the night trying to shut up a smoke detector when I'm half asleep.If only it were actually possible/do-able
Honestly if I weren't so stupid, I'd just go up on my roof myself and lag in some mounts, bolt on some rails, and throw some panels on there. But then I'd probably die when I fell off the roof.
I swear the way I'm going to go is falling of a 15' step ladder in the middle of the night trying to shut up a smoke detector when I'm half asleep.
what does this mean?FFFFFFFFFFFFFFFFFF, the PG&E portal just rejected my SNEM application, and kicked me into NEM2EXP (NEMExpanded). Their own Rule 21 documents state:
NEMExpanded is worse than NEM2-MT. Nooooooooooo
SNEM Paired Storage:
PV <=30kw pairs with storage 10kw or below
PV <=30kw pairs with storage >10kw with CRD-PCS
NEMExpanded Paired Storage:
PV >30kw pairs with storage 10kw or below
PV >30kw pairs with storage >10kw with or without CRD-PCS
PV <=30kw pairs with storage >10kw without CRD-PCS
Certification Requirementswhat does this mean?
What is CRD-PCS?
Damn dude, the PGE hate must be mutual.FFFFFFFFFFFFFFFFFF, the PG&E portal just rejected my SNEM application, and kicked me into NEM2EXP (NEMExpanded). Their own Rule 21 documents state:
NEMExpanded is worse than NEM2-MT. Nooooooooooo
SNEM Paired Storage:
PV <=30kw pairs with storage 10kw or below
PV <=30kw pairs with storage >10kw with CRD-PCS
NEMExpanded Paired Storage:
PV >30kw pairs with storage 10kw or below
PV >30kw pairs with storage >10kw with or without CRD-PCS
PV <=30kw pairs with storage >10kw without CRD-PCS
Damn dude, the PGE hate must be mutual.
Did you submit the CRD-PCS certification for the GW2?
Based on Redhill_qk's description of what CRD-PCS means (I didn't read the link), how can the GW2 be so certified when you can enable both "grid charging" and "export everything"? Or does Tesla have the ability on the backend to make those mutually exclusive, and you can request they do so, and then they give you some certification?Did you submit the CRD-PCS certification for the GW2?
The Equipment listing to the CRD specifies what it can do. The commissioning app (and perhaps the firmware) locks you out of enabling both Export everything and grid charging when its disallowed.Based on Redhill_qk's description of what CRD-PCS means (I didn't read the link), how can the GW2 be so certified when you can enable both "grid charging" and "export everything"? Or does Tesla have the ability on the backend to make those mutually exclusive, and you can request they do so, and then they give you some certification?
Cheers, Wayne
The Equipment listing to the CRD specifies what it can do. The commissioning app (and perhaps the firmware) locks you out of enabling both Export everything and grid charging when its disallowed.
Yes and no, no and yes.This explains why @h2ofun has both grid charging and grid exporting enabled on a mini powerplant with 7 Powerwalls and like seventy-bazzilion solar panels under SNEM. He doesn't need no CRD-PCS since PG&E likes him.
Yes and no, no and yes.
on my garage gateway, which has had 3 or 4 PW's. grid exporting is not enabled, grid charging is
On my house gateway, which has had 2 or 3 PW,s grid exporting is enabled, and so is grid charging.
When I have called tesla to ask why different, I never got an answer.