56-panel redo. Yesterday, they acknowledged my email from Friday asking for more panels and told me that redesigns are backed up 7-10 days. Today I got the redesign.
Not crazy about panels on the front of the house, and they're definitely straining the WAF, especially with the zigzag. It looks like they are minimizing DC cable length to reduce loss. My meter is at the easternmost corner. My garage panel is under the northernmost panel. If they chose that southeast facing roof to the west of the "pie slice" the DC run would cross the whole house. I've asked to have my inverters installed inside.
The roof next to the words front of house is second floor elevation, but it looks like the panels might fit in a 2x4 block there. Hard to tell with the 3 foot setback requirement in the Fire Code.
View attachment 564463