***Cross Posted from the Supercharger Thread***
I stopped for lunch at Wawa in Bensalem, PA this afternoon and noticed that they had a portion of the parking lot roped off for construction, including 6 posts (presumably for signage), 6 PVC stubs (presumably for power), and white Square D cabinets off to the side that all looked suspiciously like an EV charging install.
A quick look online shows no indication of this site as part of the "coming soon" Supercharger roll-out, but the location is very convenient to the PA Turnpike/Rt 1 and Wawa has committed to doubling the number of Superchargers at its stores.
I will try to grab a picture and post it for confirmation from the experts, but is there any precedent to construction starting on an "unannounced" location?
I stopped for lunch at Wawa in Bensalem, PA this afternoon and noticed that they had a portion of the parking lot roped off for construction, including 6 posts (presumably for signage), 6 PVC stubs (presumably for power), and white Square D cabinets off to the side that all looked suspiciously like an EV charging install.
A quick look online shows no indication of this site as part of the "coming soon" Supercharger roll-out, but the location is very convenient to the PA Turnpike/Rt 1 and Wawa has committed to doubling the number of Superchargers at its stores.
I will try to grab a picture and post it for confirmation from the experts, but is there any precedent to construction starting on an "unannounced" location?