I was at the site this morning while returning from Atlanta from Long Island, NY. I spoke to the construction crew. They have not yet received the Tesla equipment - expecting today or tomorrow, but they have dug out channels and installed the conduit. The pads for the Superchargers and the Utility Transformer will be poured shortly. The service will be 900kWh. They expect to have their construction done by the end of next week, but are not sure when the transformer will be installed. I gave the crew chief a ride, and he loved it. Location as previously report, next to Yogurt Mountain is correct.
The container in the picture is theirs, no Tesla equipment yet. The transformers and charger cabinets will be on the opposite side of the container shown, where you can see the tops of some trees.