@old_geez double for you then. You deserve it.Early November here. Ordered on 06/11. Don’t know of any earlier.
I’d have pulled my hair out by now.
Am sure it will be worth it.
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
@old_geez double for you then. You deserve it.Early November here. Ordered on 06/11. Don’t know of any earlier.
Nissan Leaf available. I test drove one.....was......ok.....kinda.....In QLD, they have given rebates of $3,000 for vehicles up to $58,000. The basic Tesla (at the time) was $59,000 and was the only EV available in QLD except for the Audi eTron or Merc EV which were well over $100,000.
This is the post I dread.I ordered an M3P the day after it kicked over from 3-6 weeks to 8-12 weeks. I'm still awaiting a VIN 26 weeks and 3 days later...
Looks like it.Not actually the giga factory, but a fairly significant supplier by the sounds of it.
BYD ATTO 3? MG ZS EV?In QLD, they have given rebates of $3,000 for vehicles up to $58,000. The basic Tesla (at the time) was $59,000 and was the only EV available in QLD except for the Audi eTron or Merc EV which were well over $100,000.
Erm, The Turandot has finished loading up and left Shanghai... How do you know she is not carrying Teslas, or not many?That’s probably why Turandot is not loading our Model 3s.
Maybe not.. Glovis Splendor has just been sitting there for days at Luchao. It arrived on the 7th and is still moored. Turandot was in and out way quicker arrived on the 9th, took on a big load (draught maxxed out) and has already left. Might point to a bunch of RHD and a wait for LHD? There should be relatively way more LHD on a Euro ship and relatively way more RHD on an Aus/NZ ship. Plus we have UK delivery dates doing whacky stuff. Optimist for life.According to CPCA China, Tesla Shanghai produced 10,757 cars during Apr 2022. 1,512 units were delivered to the Chinese Domestic market. That’s probably why Turandot is not loading our Model 3s. Out of the 10,757 - 1,512 = 9,245 units, most of them must be LHD cars. Out of the RHD drive ones, there might just be a total of like max 1k that’s for Australia. I shall quit the forum for like 2 weeks and expect the next ship…. Helps with the anxiety
P also adds the Track Mode stuff.I decided the extra $ for performance was not justified for larger breaks, wheels and a spoiler.
Erm, The Turandot has finished loading up and left Shanghai... How do you know she is not carrying Teslas, or not many?
I expect VINs to start appearing in the next week, the question is how many (of each config)
Trying to set a low expectation, then maybe luckily mine is on it. RN1164 placed on 27th Jan. SR+ White/Black MEL.Maybe not.. Glovis Splendor has just been sitting there for days at Luchao. It arrived on the 7th and is still moored. Turandot was in and out way quicker arrived on the 9th, took on a big load (draught maxxed out) and has already left. Might point to a bunch of RHD and a wait for LHD? There should be relatively way more LHD on a Euro ship and relatively way more RHD on an Aus/NZ ship. Plus we have UK delivery dates doing whacky stuff. Optimist for life.
Also i saw someone tonight saying that Giga Shanghai is in "export mode". Related to the supply chain issues. Can't remember where now, sorry. Also it could be garbage.
Having an optimistic or pessimistic view won't impact the universe at all. It'll only impact your own outlook in life and therefore wellbeing.Trying to set a low expectation, then maybe luckily mine is on it. RN1164 placed on 27th Jan. SR+ White/Black MEL.
There goes any remaining optimism I had! Hopefully arrives before 2023!I ordered an M3P the day after it kicked over from 3-6 weeks to 8-12 weeks. I'm still awaiting a VIN 26 weeks and 3 days later...
The Atto 3 is not available until at least August. We bought one on the first day orders opened. I don’t know about the MG.BYD ATTO 3? MG ZS EV?
My mate ordered in Dec and has his RWD so you must have been close to getting yours.Trying to set a low expectation, then maybe luckily mine is on it. RN1164 placed on 27th Jan. SR+ White/Black MEL.
And it hurt even more when a friend who ordered the same car a month later, only in white, had his delivered on Feb 28This is the post I dread.
I was told that VINs are allocated before the car is built and assigned until after it's built. Has this changed to allocate after loading ?Erm, The Turandot has finished loading up and left Shanghai... How do you know she is not carrying Teslas, or not many?
I expect VINs to start appearing in the next week, the question is how many (of each config)