me too…My order is still sitting in October since yesterday
Appreciate the post and some great info regarding how EDD may be determined and reasons for all the fluctuationsI called the Tesla main number today just to figure out what was going on with the sudden swing from September to November EDD.
Ended up speaking to a kind enough young lady who explained the whole situation in what seemed to me the most honest way ive heard.
the factory makes estimates on the number of each T/M/S (Type/Model/Series for the non-military types, variations of a type of vehicle) that the factory can produce in a given time period based on material available, labor, etc. the factory says, for example “I can produce X# MYLR MSM, 20in, 7 seat with tow between 1 Sept - 15 Sept”. This estimate based on factory estimated output is updated daily.
The system uses that number of T/M/S vehicles produced combined with the individuals place in the queue with that T/M/S to determine the rough EDD.
As time progresses the factory updates its estimate of T/M/S produced based on available materials resulting in EDD changes.
As time progresses, with # T/M/S produced, the system organizes them into batches that can be binned into shipments to a geographic location. All of this occuring before the vehicle is constructed and a VIN is assigned.
Once the vehicle is constructed, a VIN is assigned, its already aligned to a DC with transpo already ordered and staged.
This is just a hypothesis based on the conversation I had with the Tesla lady today, but i would be interested in thoughts. At the end of the day, she said I will not be getting a car this quarter based on what the factory thinks it can produce before EoQ. According to her, I will be lucky to get a car in November.
all that aside, most of this is me trying to distract myself from whats going on in Kabul. If you get a spare moment, please consider thinking about the families of the Marines and sailors with the 24 MEU and 2/1 as well as the Afghans trying to seek a future of their choosing.
sorry for being a debbie downer, i just couldnt not ask for thoughts and prayers for those willing to give them.
I called the Tesla main number today just to figure out what was going on with the sudden swing from September to November EDD.
Ended up speaking to a kind enough young lady who explained the whole situation in what seemed to me the most honest way ive heard.
the factory makes estimate forecasts on the number of each T/M/S (Type/Model/Series for the non-military types, variations of a type of vehicle) that the factory can produce in a given time period based on material available, labor, etc. the factory says, for example “I can produce X# MYLR MSM, 20in, 7 seat with tow between 1 Sept - 15 Sept”. This estimate based on factory estimated output is updated daily.
The system uses the forecast of T/M/S vehicles produced combined with the individuals place in the queue with that T/M/S to determine the rough EDD.
As time progresses the factory forecasts update and estimates of T/M/S expected to be produced in a given time period based on available materials inform a rough EDD to the customer.
As time progresses, with # T/M/S produced, the system organizes them into batches that can be binned into shipments to a geographic location. All of this occuring before the vehicle is constructed and a VIN is assigned.
Once the vehicle is constructed, a VIN is assigned, its already aligned to a DC with transpo already ordered and staged.
This is just a hypothesis based on the conversation I had with the Tesla lady today, but i would be interested in thoughts. At the end of the day, she said I will not be getting a car this quarter based on what the factory thinks it can produce before EoQ. According to her, I will be lucky to get a car in November.
all that aside, most of this is me trying to distract myself from whats going on in Kabul. If you get a spare moment, please consider thinking about the families of the Marines and sailors with the 24 MEU and 2/1 as well as the Afghans trying to seek a future of their choosing.
sorry for being a debbie downer, i just couldnt not ask for thoughts and prayers for those willing to give them.
Could you explain what DCU is? I’ve seen it referenced a lot; I’m assuming it’s some kind of ultra low rate credit union?Nah they just have the lowest rate. 1.49 if I’m not mistaken. Then you get an extra 0.25 off if EV loan. I haven’t looked at my account in awhile but I am using DCU just to get the match to give to Tesla. They will match it exactly if you show proof.
Lol I ordered 5/17 and nothingCongrats! All of us who ordered before July 18 will be checking our emails constantly now.
Thank you for the information, very detailed write up! Seems kinda unreasonable that your June order wouldn't be delivered this quarter. November is definitely pushing it.I called the Tesla main number today just to figure out what was going on with the sudden swing from September to November EDD.
Ended up speaking to a kind enough young lady who explained the whole situation in what seemed to me the most honest way ive heard.
the factory makes estimate forecasts on the number of each T/M/S (Type/Model/Series for the non-military types, variations of a type of vehicle) that the factory can produce in a given time period based on material available, labor, etc. the factory says, for example “I can produce X# MYLR MSM, 20in, 7 seat with tow between 1 Sept - 15 Sept”. This estimate based on factory estimated output is updated daily.
The system uses the forecast of T/M/S vehicles produced combined with the individuals place in the queue with that T/M/S to determine the rough EDD.
As time progresses the factory forecasts update and estimates of T/M/S expected to be produced in a given time period based on available materials inform a rough EDD to the customer.
As time progresses, with # T/M/S produced, the system organizes them into batches that can be binned into shipments to a geographic location. All of this occuring before the vehicle is constructed and a VIN is assigned.
Once the vehicle is constructed, a VIN is assigned, its already aligned to a DC with transpo already ordered and staged.
This is just a hypothesis based on the conversation I had with the Tesla lady today, but i would be interested in thoughts. At the end of the day, she said I will not be getting a car this quarter based on what the factory thinks it can produce before EoQ. According to her, I will be lucky to get a car in November.
all that aside, most of this is me trying to distract myself from whats going on in Kabul. If you get a spare moment, please consider thinking about the families of the Marines and sailors with the 24 MEU and 2/1 as well as the Afghans trying to seek a future of their choosing.
sorry for being a debbie downer, i just couldnt not ask for thoughts and prayers for those willing to give them.
Not yet....hopefully this weekend or next week.So anyone with January EDD's get pushed back yet?
This information needs to be pinned or put in a FAQI called the Tesla main number today just to figure out what was going on with the sudden swing from September to November EDD.
Ended up speaking to a kind enough young lady who explained the whole situation in what seemed to me the most honest way ive heard.
the factory makes estimate forecasts on the number of each T/M/S (Type/Model/Series for the non-military types, variations of a type of vehicle) that the factory can produce in a given time period based on material available, labor, etc. the factory says, for example “I can produce X# MYLR MSM, 20in, 7 seat with tow between 1 Sept - 15 Sept”. This estimate based on factory estimated output is updated daily.
The system uses the forecast of T/M/S vehicles produced combined with the individuals place in the queue with that T/M/S to determine the rough EDD.
As time progresses the factory forecasts update and estimates of T/M/S expected to be produced in a given time period based on available materials inform a rough EDD to the customer.
As time progresses, with # T/M/S produced, the system organizes them into batches that can be binned into shipments to a geographic location. All of this occuring before the vehicle is constructed and a VIN is assigned.
Once the vehicle is constructed, a VIN is assigned, its already aligned to a DC with transpo already ordered and staged.
This is just a hypothesis based on the conversation I had with the Tesla lady today, but i would be interested in thoughts. At the end of the day, she said I will not be getting a car this quarter based on what the factory thinks it can produce before EoQ. According to her, I will be lucky to get a car in November.
all that aside, most of this is me trying to distract myself from whats going on in Kabul. If you get a spare moment, please consider thinking about the families of the Marines and sailors with the 24 MEU and 2/1 as well as the Afghans trying to seek a future of their choosing.
sorry for being a debbie downer, i just couldnt not ask for thoughts and prayers for those willing to give them.
Nice...go #TEAMBLUE
Maybe that's a job for somebody's Tesla-bot.Yeah it would be helpful to have a digest for when we return to the site each day.
If this information is correct, wouldn't that mean that all those going from an MYLR to an MYP are actually moving folks in the MYLR queue forward?I called the Tesla main number today just to figure out what was going on with the sudden swing from September to November EDD.
Ended up speaking to a kind enough young lady who explained the whole situation in what seemed to me the most honest way ive heard.
the factory makes estimate forecasts on the number of each T/M/S (Type/Model/Series for the non-military types, variations of a type of vehicle) that the factory can produce in a given time period based on material available, labor, etc. the factory says, for example “I can produce X# MYLR MSM, 20in, 7 seat with tow between 1 Sept - 15 Sept”. This estimate based on factory estimated output is updated daily.
The system uses the forecast of T/M/S vehicles produced combined with the individuals place in the queue with that T/M/S to determine the rough EDD.
As time progresses the factory forecasts update and estimates of T/M/S expected to be produced in a given time period based on available materials inform a rough EDD to the customer.
As time progresses, with # T/M/S produced, the system organizes them into batches that can be binned into shipments to a geographic location. All of this occuring before the vehicle is constructed and a VIN is assigned.
Once the vehicle is constructed, a VIN is assigned, its already aligned to a DC with transpo already ordered and staged.
This is just a hypothesis based on the conversation I had with the Tesla lady today, but i would be interested in thoughts. At the end of the day, she said I will not be getting a car this quarter based on what the factory thinks it can produce before EoQ. According to her, I will be lucky to get a car in November.
all that aside, most of this is me trying to distract myself from whats going on in Kabul. If you get a spare moment, please consider thinking about the families of the Marines and sailors with the 24 MEU and 2/1 as well as the Afghans trying to seek a future of their choosing.
sorry for being a debbie downer, i just couldnt not ask for thoughts and prayers for those willing to give them.
Congratulations! So happy for you guys!Wife’s Model Y is in! Absolutely flawless. Not one issue noticed as of this post. #TeamBlue who are still waiting, youre next! Keep the faith brothers and sister!
Next up, my MYP coming next weekend!
Congratulations! So happy for you guys!
Glad the Juicebox is working well for you guys! Heard lots of good things about it.FWIW I have the JuiceBox as well. I have a Nema 14-50 outlet and it just plugs right in. We use it to charge my wife’s M3LR. We used to use her model connector but then would forget to take it with us on long road trips. Decided to get something universal instead of the Tesla wall mount because who knows how long we will have the 3 and if I will ever get a Y. The JuiceBix works pretty well.
We have a similar build. OD 5/31 and I’m waiting right along with you. Give us MayMYs our damn VINs!Lol I ordered 5/17 and nothing
Congrats! And holy macaroni. July 9 order? VIN already? There are May order holders still waiting for their VIN. Count yourself lucky!Just got my VIN today! 256xxx. Super pumped!