I was close:80 was the lucky number!!!!!!!
Just logged into the app and there it was! That sweet sweet VIN. 257xxx. EDD 5 day window changed to May 31-June 3.
“My prediction is you both get VINs Sunday or Monday with a 05/30-06/03 EDD “
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
I was close:80 was the lucky number!!!!!!!
Just logged into the app and there it was! That sweet sweet VIN. 257xxx. EDD 5 day window changed to May 31-June 3.
I think what you’re talking about is the concept of a confidence interval. Tesla was likely 95% or so confident that your delivery date would fall in that range. Which unfortunately means that there was a 2.5% chance the actual delivery date is later while there was also a 2.5% chance it might be earlier.But this uncertainty should be reflected in the delivery date. And it's not. The estimated delivery date, in fact, reflects a high degree of certainty that the car is just about ready to go.
Today is 5/17. My estimated delivery date is 5/17-5/21. Which means Tesla is giving me reason to believe there's actually a legitimate chance the car will be delivered today, and no reason to believe it will be delivered later than Saturday.
Tesla should not be communicating that range if it does not already have the part ready to install, let alone if it doesn't even know when the part will be shipped. There is just zero reason to overpromise at this point, especially given that customers will be making plans and decisions based on that date.
Hey! That’s my car!Alright guys, since I’ve officially graduated I probably won’t be spending much time here anymore. Thanks for the entertainment for the last two months and good luck to all of you waiting. I can’t stress enough, it is worth the wait.
For a bit of hope for you guys waiting, I drove by the dealership today and there was yet another truck delivering vehicles. There was one that pulled up yesterday as I was leaving as well. Two trucks, two days in a row is a good sign, especially for a smaller market like SLC.
PS: dropping it off tomorrow morning for paint correction, ceramic, and window tinting and I don’t want to give it up for two days. Like, I really don’t want to drive my truck for two days now lol.
Super Congrats! The more late Feb orders pushed out, the better for meWell everyone, tomorrow is the big day. Payment made, trade accepted, insurance in place!
My delivery appointment is @ 4:00pm. MSM with 18s, no FSD. VIN 2473XX received on May 9th.
Fingers crossed I have the Matrix headlights? Anyone get one in that range without them? I'm guessing the build date is in May based on when I was assigned a VIN.
YesJust joined.
OD 3/22, EDD 6/9-7/7,
M3LR, Red, white interior, Aero, NoFSD, Kennesaw,GA delivery location. Should I wait until I get contacted with a VIN before I start my loan process?
Yeah I agree, the EDD is just giving false hope. I don't know how long I've been waiting, maybe the 3rd or 4th week after the VIN was assigned and charging port waiting game started. The 233xxx range is still waiting for it at Seattle and local SC finally told me they're only receiving 1 or 2 pieces of supply every couple days after I asked them for the 5th time. I don't know why it's so hard for Tesla for being transparent. Like checking the car build date, it literally takes 2 second in the system to find it, but Tesla only give you the build month until you beg for it.But this uncertainty should be reflected in the delivery date. And it's not. The estimated delivery date, in fact, reflects a high degree of certainty that the car is just about ready to go.
Today is 5/17. My estimated delivery date is 5/17-5/21. Which means Tesla is giving me reason to believe there's actually a legitimate chance the car will be delivered today, and no reason to believe it will be delivered later than Saturday.
Tesla should not be communicating that range if it does not already have the part ready to install, let alone if it doesn't even know when the part will be shipped. There is just zero reason to overpromise at this point, especially given that customers will be making plans and decisions based on that date.
I think we are still waiting on T-J-. He ordered the same day as me and is still waiting.I was close:
“My prediction is you both get VINs Sunday or Monday with a 05/30-06/03 EDD “
Going on week 2 waiting for this “charge port” and my 13th one day EDD push. Can they figure this out already…it’s agonizing knowing the car you’ve been waiting 4 months for is at the delivery center but waiting on a part with 2-300 other cars. Sigh.Yeah I agree, the EDD is just giving false hope. I don't know how long I've been waiting, maybe the 3rd or 4th week after the VIN was assigned and charging port waiting game started. The 233xxx range is still waiting for it at Seattle and local SC finally told me they're only receiving 1 or 2 pieces of supply every couple days after I asked them for the 5th time. I don't know why it's so hard for Tesla for being transparent. Like checking the car build date, it literally takes 2 second in the system to find it, but Tesla only give you the build month until you beg for it.
This is often the most interesting time on the forum when people get their morning updates. We should see more coming in the next hour or so as those of you on the left coast wake up.I woke up this morning to a 10 day EDD.
Previously my EDD was 05/24 - 06/07 it is now 05/21 - 05/31.
That was your fifth post so you can put your details in your signature now if you like. Just click on your name at the top of the screen and then your settings to change the signature.OD: 02/27
first EDD range 03/18 ~ 03/31
Location: Ft Lauderdale Fl Model: 3 LR red 19” no fsd
just received my 6th edd June 12 - July 10
Meh
Never assume... I've been driving my April OD model 3 for almost a week now. It was NOT a cancelation.Last day of April OD for me. What’s yours?
From what I have seen I would wait until you have a 2 week EDD then apply, this will give you more time. VIN to pick up can be a fairly short time period, 2-5 days. Less stress if you knock out the paperwork early, rates are likely locked in for 45 or 60 days depending on the bank, maybe you get a lower rate since rates are constantly rising. Good luck.Just joined.
OD 3/22, EDD 6/9-7/7,
M3LR, Red, white interior, Aero, NoFSD, Kennesaw,GA delivery location. Should I wait until I get contacted with a VIN before I start my loan process?
Sound advice IMO. And if you don't have your financing in place you may not be able to accept an early offer from Tesla if someone else cancels ahead of you.From what I have seen I would wait until you have a 2 week EDD then apply, this will give you more time. VIN to pick up can be a fairly short time period, 2-5 days. Less stress if you knock out the paperwork early, rates are likely locked in for 45 or 60 days depending on the bank, maybe you get a lower rate since rates are constantly rising. Good luck.
Can you share which banks lock in rates for 45-60 days?From what I have seen I would wait until you have a 2 week EDD then apply, this will give you more time. VIN to pick up can be a fairly short time period, 2-5 days. Less stress if you knock out the paperwork early, rates are likely locked in for 45 or 60 days depending on the bank, maybe you get a lower rate since rates are constantly rising. Good luck.
New here - love all the info!
OD - 3/23 Blue 18 wheels no fsd
showing EDD of June 5- July 3rd
no vin yet - looking close!