So, I've just got back from driving around the site.
- There's still a dumpster and stuff around
- Stalls are still uncovered; didn't notice cabling to them
- The trench from the transformer to the existing transformer (and thus the grid) is all done, fresh asphalt covering it and no longer blocked off.
- No transformer yet; and I didn't notice any crate saying "transformer" or anything like that.
- But there was a guy from CMP (Central Maine Power, the electric utility) working on cabling next to the transformer pad. Maybe that was setting things up from the connection from the Red Robin transformer to the transformer pad.
Still two more days until Thanksgiving and weather is forecast to be sunny, sunny, sunny so shouldn't be any interruptions.
I'll go tomorrow lunchtime or/and after work to see if there's more progress.
- There's still a dumpster and stuff around
- Stalls are still uncovered; didn't notice cabling to them
- The trench from the transformer to the existing transformer (and thus the grid) is all done, fresh asphalt covering it and no longer blocked off.
- No transformer yet; and I didn't notice any crate saying "transformer" or anything like that.
- But there was a guy from CMP (Central Maine Power, the electric utility) working on cabling next to the transformer pad. Maybe that was setting things up from the connection from the Red Robin transformer to the transformer pad.
Still two more days until Thanksgiving and weather is forecast to be sunny, sunny, sunny so shouldn't be any interruptions.
I'll go tomorrow lunchtime or/and after work to see if there's more progress.