20 V3 pre-fab supercharging stalls
3125 N Toltec Rd
Eloy, AZ 85131
32.78255° N, 111.61868° W
@corywright @Chuq @Big Earl
3125 N Toltec Rd
Eloy, AZ 85131
32.78255° N, 111.61868° W
@corywright @Chuq @Big Earl
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
It's actually just 1 stall. The others will be bollards pointing to the charging stall.With 28 stalls instead of the originally planned 20.
Ironic or Iconic?Eloy, AZ
Host Type: Gas Station
Host: Circle K
Along Primary Interstates: I-10
Along US Numbered Highways (<=5mi): None
Along Auxiliary Interstates: None
I-10
From: Casa Grande, AZ (v2) - 9.9 miles
To: Tucson - W River Rd, AZ - 47.3 miles
Diversion: 0.9 miles
From: Tempe, AZ - 49.4 miles
To: Tucson, AZ (v2) - 70.3 miles
From: Gila Bend, AZ (I-8, I-10) - 68.6 miles
Displacing the somewhat ironic Casa Grande, AZ, which has only 6 V2 stalls.
Also improves the I-8/I-10 transition cutting out 9 miles, 8 minutes and charging time compared to a diversion to Casa Grande, AZ.
Yeah, the plan says 5 pre-fabs, but the pics show 7...28 stalls! Sweet. Always a nice surprise.With 28 stalls instead of the originally planned 20.
Sometimes you need a little crazy to get results.Insane how fast these sites are built nowadays.