You may need to shrink the files to post. The site wouldn't let me upload 8 mpix images from my phone (too large). I had to shrink down to 25% of original size.I'll 2nd that on the pictures. Will be tomorrow to take pictures. I have a 4K camcorder, and 18MPixel camera. I'll have them for your viewing pleasures later:lyuriove:.
If you go today, can you get updated pictures of the trench and the pad area so we can see how many conduits are installed (and thus how many spaces)? If not, I'll check Monday if no one else has. Also count the number of charging pedestals and bollards on site. Our just ask the guys how many they are installing. :smile:
With that big lot up by the main building, I highly doubt anyone will ICE the furthest spots and take a long walk, when they can park much closer. I wrote a long diatribe about that here in post 70I'm hoping that during the busy season, these spots will not be ICE'd or I'll be surely pissed.