They're making really good progress at this site. Pedestals for the charging posts are installed, metering/control cabinets are on site, pads are poured, and interconnecting conduits are installed. The most difficult portion of the 600ft conduit run to the feed transformer (including across the roadways and parking lots) is finished, too.
Note that this will definitely be an 8 stall station (vs 12 stall per supercharge.info). Also, it looks like they will be installing a new streetlight for the area.
View attachment 597128