the rest will depend on Tesla and Xcel Energy to energize.
So about another 2-3 months. Got it.
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
the rest will depend on Tesla and Xcel Energy to energize.
Well this didn’t take long. Stopped by on the way home today. 4 of the 8 stalls are up. Talked briefly to what seemed to be the foreman of the installing crew. Very nice guy. They are from Kentucky. They were the same guys that installed the ND Superchargers. Said they will be completed by Friday before moving to the other Minneapolis location. Obviously the rest will depend on Tesla and View attachment 572036 View attachment 572037Xcel Energy to energize.
What's the black thing standing at a slant to the right of the pedestals? Is that a cable that didn't get properly dealt with?
Yep. It’s a cable.
Just chatted with the crew of three. Two local, one from Kentucky. The install work will be all done today. Then it’s up to Tesla.
they are heading to the “downtown” Minneapolis site next where they’ve already broken ground. No other info leaks. They learn where they are going next only one week in advance. View attachment 575824
And Sioux City. I29 needs to be completed.I wonder if they plan to eventually move on after that to do Grand Forks ND, and even maybe Pembina ND as the remaining pieces of their plans in this general region?